|
|
Archives of the TeradataForum
Message Posted: Wed, 19 Mar 2008 @ 13:11:10 GMT
Subj: | | Re: Conflicts with Teradata Backups |
|
From: | | Sanchez, Idrike |
| Our backups take over 9 hours to complete and it is not very feasible to not run loads for a 9 hour window. | |
Our backups also take about 9 hours to run. Yes we run other loads during that time (mostly tpumps), but some batch loads. We have split up
the backups to 3 relatively equal jobs (size-wise) to run thruout the day on Saturday. This has allowed us to only have to shutdown the loads for
a shorter amount of time.
Kiki Sanchez
Data Warehouse Group
Technology Division
Continental Airlines
| |