Subj:   Re: Conflicts with Teradata Backups
 
From:   Sanchez, Idrike

  Our backups take over 9 hours to complete and it is not very feasible to not run loads for a 9 hour window.  


Our backups also take about 9 hours to run. Yes we run other loads during that time (mostly tpumps), but some batch loads. We have split up the backups to 3 relatively equal jobs (size-wise) to run thruout the day on Saturday. This has allowed us to only have to shutdown the loads for a shorter amount of time.


Kiki Sanchez
Data Warehouse Group
Technology Division
Continental Airlines



     