|     | Our backups take over 9 hours to complete and it is not very feasible to not run loads for a 9 hour window. |     |  
 
  
Our backups also take about 9 hours to run.  Yes we run other loads during that time (mostly tpumps), but some batch loads.  We have split up
the backups to 3 relatively equal jobs (size-wise) to run thruout the day on Saturday.  This has allowed us to only have to shutdown the loads for
a shorter amount of time. 
 Kiki Sanchez 
Data Warehouse Group 
Technology Division 
Continental Airlines 
 
 
 
 
   
 
 |   |