|
Archives of the TeradataForumMessage Posted: Fri, 09 Jan 2004 @ 21:56:06 GMT
Hi Brian: Since the Mload utility locks the table, you are not able to run them both at the same time. This is probably what you have determined. My advice would be to do one of two things: 1. Concatenate your files together and then run them through a single Mload 2. Schedule them via your client computer. If MVS - in JCL, one after the other, if UNIX in a shell script or lastly in DOS in a .bat file Hope this helps, Michael Larkins
| ||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||
Copyright 2016 - All Rights Reserved | ||||||||||||||||||||||||||||||||||||||||||||||||
Last Modified: 15 Jun 2023 | ||||||||||||||||||||||||||||||||||||||||||||||||