|
Archives of the TeradataForumMessage Posted: Sat, 11 Jun 2005 @ 14:02:29 GMT
The Multiload reference manual (R5) on pg. 2-38 has a table on "Impact of down AMPs". If an AMP goes offline (a system restart obviously occurs) and depending on the mload phase and if any target tables are non-fallback (most probable I would think), the mload task will pause and problem resolution needs to happen before restarting mload.
| ||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||
Copyright 2016 - All Rights Reserved | ||||||||||||||||||||||||||||||||||||||||||||||||
Last Modified: 15 Jun 2023 | ||||||||||||||||||||||||||||||||||||||||||||||||