Home Page for the TeradataForum
 

Archives of the TeradataForum

Message Posted: Fri, 01 Mar 2002 @ 15:28:00 GMT


     
  <Prev Next>   <<First <Prev Next> Last>>  


Subj:   Re: Priority Scheduler Problem - Help
 
From:   Fred W Pluebell

Known input edit bug fixed in later releases. Workaround is to specify a large number instead of zero for the last milestone limit.

schmon -p ACE_M 1 2 R 9600 6 32767 5

You do realize that 9600 is a fairly large limit? For type R, milestones are expressed in accumulated session CPU seconds PER NODE. On a 4-way SMP node that equates to at least 40 minutes elapsed even if there is nothing else in the system consuming CPU time.



     
  <Prev Next>   <<First <Prev Next> Last>>  
 
 
 
 
 
 
 
 
  
  Top Home Privacy Feedback  
 
 
Copyright for the TeradataForum (TDATA-L), Manta BlueSky    
Copyright 2016 - All Rights Reserved    
Last Modified: 15 Jun 2023