Archives of the TeradataForum
Message Posted: Fri, 08 Jun 2012 @ 16:24:49 GMT
Subj: | | Re: Tenacity and Fastload/Multiload |
|
From: | | Prescott, Kyle |
It will be deferred until a slot opens-up. It will abend if the tenacity period expires (i.e. 4 hours). The Sleep parameter governs interval
where the job will "sleep" between trials.
The workload settings governed by DBSCONTROL General MaxLoadTasks and TASM to determine the number of load tasks that are able to be concurrent
on the system since they utilize AmpWorkTasks.
Kyle Prescott | DBA Manager | Unum-EHDS | Chattanooga, TN
|