Archives of the TeradataForum
Message Posted: Thu, 19 Nov 2009 @ 22:29:21 GMT
| Subj: | | Re: Netvault Error: Scheduler exited unexpectedly |
| |
| From: | | Darapureddy, Sudheer |
Hi Ram,
Refer to the Knowledge Article S11000B6AC2. May be you are also facing the same situation.
------------------------------------------------------------
Short Description: NetVault log displays "Scheduler Exited Unexpectedly, Abandoning Job" error, followed by multiple drive channel
errors
Product Category: OS/Applications / NetVault
Product: NetVault /
Date Written: 12 July 2005
Last Edited: 28 August 2009
Condition/Symptom:
Customer may see a backup job fail with multiple " had channel error" entries reported in the binary logs. These errors often result due to
the NetVault services shutting down while backup job(s) are active.
In the Job Management display, the "Run Status" for the job is "Scheduler aborted whilst job running."
Probable Cause:
The source error is, in fact, "Scheduler Exited Unexpectedly, Abandoning Job" followed by "Media Manager Stopping" entry. The "Media Manager
Stopping" entry can only be viewed when the logs are filtered with Warning Level set to 'All'.
Solution:
If the NetVault Server is shutdown during backup jobs, all backup jobs will terminate. Ensure that all backup jobs have stopped before shutting
down NetVault services and/or restarting the node.
------------------------------------------------------------
Thanks,
Sudheer.
|